Excitement is building around the possible reopening of the Dubai Fountain after new social media videos and photographs surfaced showing water being refilled at the world-famous attraction in Downtown Dubai.
Buzz on Social Media
Clips widely shared on TikTok and fresh photos taken on August 22 reveal water filling the massive lake at the base of Burj Khalifa. The sight has sparked speculation that the fountain’s dazzling shows could soon return, with many users suggesting an October timeline.
No Official Confirmation Yet
Despite the buzz, developer Emaar has not announced a reopening date. While October has been speculated as the target, no official confirmation has been provided.

Closed Since April for Major Renovations
The Dubai Fountain has been closed since April 2025, when its last show was staged. In June, Emaar released a video offering a rare behind-the-scenes look at the large-scale maintenance and upgrade works. Over recent months, heavy equipment was seen at the site as crews worked on significant structural improvements.
Key Upgrades Underway
One of the most critical enhancements is the installation of a new, reinforced fountain floor to replace the old base that often developed cracks. The renovation includes:
- A special waterproofing layer on treated concrete blocks.
- A primer and insulation system to improve water retention.
- A striking layer of blue tiles that glow beneath the water, designed to enhance visual appeal from every angle of the lake.
Engineering Marvel Beneath the Surface
Covering an area the size of 18 football fields, the Dubai Fountain lake hides a highly sophisticated system of water jets, robotic arms, and synchronised lighting. Together, they create the iconic “dancing water” shows that have become one of Dubai’s most visited attractions.